AEEC Home | Training Index | Index | Top | Previous | Next

ECCJ / Text India

1.1.2 Outline of Evaluation Criteria (Chart)
( e.g : Rationalization of burning fuel )
Object Management

Measurement & Record

Maintenance &
Check Up

Measures for new construction of facility

1. Rationalization of burning fuel

1)1.anage air ratio
According to combustion facilities and fuel type. “Management Standard”
2.Lower air ratio according to appended chart1.(A) for combustion facilities.  “Criterion”
3. For multiple facilities, adjust load and manage general heat efficiency. “Management Standard”
4. Fuel management to enhance combustion efficiency.

2) Measurement records of supplied fuel amount,
exhaust gas temperature, 02%, etc.
“Management Standard”  

3) Proceed maintenance and check up of the combustion facility and sustain desirable condition.

“Management
Standard”

4)1. Adjust fuel amount and air ratio of the combustion apparatus according to load change.
2. Adjust ventilation volume and combustion chamber pressure of the ventilator.

:
:
:
:
:

6. Rationalization of converting Electricity into power, heat etc

 

 

 

 


1.2.1 Guidelines by The Law
Items & Numerical Expression
  • Air Ratio for Boiler
  • Air Ratio for Furnace
  • Heat Recovery for Furnace
  • Waste gas temp. / Boiler
  • Wall temp. / Furnace
  • Power Factor
  • Motor Efficiency

Guideline --- Combustion / Boiler

Guideline --- Combustion / Furnace

2/9
Next
AEEC Home | Training Index | Index | Top | Previous | Next
Copyright(C) ECCJ 1996-2019