AEEC Home | Training Index | Index | Top | Previous | Next

ECCJ / Text India

4. Boilers, Industrial Furnaces, Steam Systems, Heat Exchangers, Waste Heat, Waste Water, etc. (2/2)

5. Power Receiving/Transforming Equipment, Motors, Lighting and Electric Heating Systems (1/2)

5. Power Receiving/Transforming Equipment, Motors, Lighting and Electric Heating Systems (2/2)

Determination of Improvement Items
  • After the data collection in the factory, improvement items are picked up.
  • Direction of improvement is determined through the discussion with factory engineers.
  • Providing the measured data and reporting the contents of energy audit and direction of improvement to the factory manager in the last day.

5/21
Next
AEEC Home | Training Index | Index | Top | Previous | Next

Copyright(C) ECCJ 1996-2019