AEEC Home | Training Index | Index | Top | Previous | Next

Trainig text INDONESIA

Factory/Business Establishments Measures Under the Energy Conservation Law

- The energy conservation law was revised in FY2002 to enhance energy management in the commercial sector, whose energy consumption has surged.

- Action plans initiated by Keidanren and other industries shall be formulated/followed-up. (Support under the supplemental provisions are provided for achievement.)

Factories/business establishments with high energy consumption Type 1 Designated Energy Management Factories

Factories/business establishments with medium energy consumption Type 2 Designated Energy Management Factories
- Annual fuel (thermal) use: At least 3000kl in crude oil equivalent

- Annual electricity use: At least 12 million kwh

Factories

Measures
- Appointment of Energy Manager
(Mandatory to possess Energy Manager License)

- Preparation Submission of Periodical Reports

- Formulation Submission of Mid- and long- term Plans

Measures
- Appointment of Energy Manager Energy Manager Training Required

- Preparation & Submission of Periodical Reports

- Preparation and Submission of mid- and long-term plans (Participation of a Qualified Energy Management Officer Required)

- Annual fuel (thermal) use: At least 1500kl in crude oil equivalent
- Annual electricity use: At least 6 million kwh

Factories and business establishments

Measures
-Appointment of Energy Management Officer

- Preparation & Submission of Periodical Reports


Measures for Factories/Business Establishments Under the Energy Conservation Law

- On-site investigation (factory inspection) has been conducted since FY2001 on Type 1 esignated Energy Management Factories.

- Compliance to the factory/business establishments standards is investigated to assess the need for guidance based on objectively set criteria.

- Establishments that have an extremely poor level of energy use rationalization are instructed to prepare/submit a rationalization plan, implement the rationalization plan, and take other relevant steps.

Flow of general inspection

12/21
Next

AEEC Home | Training Index | Index | Top | Previous | Next

Copyright(C) ECCJ 1996-2019