Audit for Energy Conservation of Factory
by ECCJ
(medium-sized factory)
 

Framework of the system
  1. Objects: factories of the scales falling under type 2 designated energy management factory Fuel = 1,500 to 3,000kL/y, electric power = 6 to 12 million kWh/y
  2. Audit to be done in response to application by the audited factory
  3. Submission of the preliminary survey sheet on energy audit from the applicant
  4. One-day onsite survey by two specialists, one in thermal energy and the other in electric power
  5. Analysis of data and sending of the report
  6. Energy audit done free of charge (administration’s budget)
  7. Nationwide endeavor (at ECCJ’s 9 branches)
  8. Items to be entered are standardized and statistical analysis is facilitated.
  9. The audited factory has no obligation to implement the proposals.
  10. Questionnaire surveys one year after audit indicate that about 30 percent of the proposals are implemented.
  11. Specialists are selected from those who have been registered in ECCJ.
  12. The institution and procedure of energy conservation audit for buildings are the same as those of the factory energy conservation audit.

Scheme and procedure