(3) Establishment of management standards
and
standard values based on
the assessment
standards and their enhancement
(to be assessed
by the scores attained)
1. Rationalization of the
combustion of fuels
2. Rationalization of heating,
cooling and
heat
transmission
2.2 Air conditioning equipment
and hot water
supply facilities
3. Prevention of heat loss
by radiation,
conduction, etc.
4. Recovery of waste heat
for reuse
5. Rationalization of the
conversion of heat
to power, etc.
6. Prevention of resister
losses, or other
loss of electricity
7. Rationalization of the
conversion of electricity
to power,
heat, etc.
|
|
|
The survey should be conducted for the following
items as to whether they
have applicable
management standards and
standard values
for each of the activity
items listed on
the left.
1) Management
(2) Measurement and recording
(3) Maintenance and inspection
((4) Measures for the new item)
|
|