AEEC Home | Training Index | Index | Top | Previous | Next

METI / ECCJ / ACE Training Program MTPEC04 (2006.02)

Air Conditioning 1/2
(Electric Machinery Factories)
House keeping
(review room temp, stop fan/pump, etc)
Energy saving during night & holiday
Inverter VSD (cooling water pump, others)
Maintenance of filter/coils (cleaning)
Programmed control (scheduled on/off)
Automatic start/stop control (multi-refrigerators)
Ice thermal storage for air conditioning
Use of outdoor air
Stop of air-conditioning of unused space
Heat-barrier paint (factory roof)
Heat-barrier plate (around process furnace)
Insulation of building
Space heating by heat pump (stop electric heater)

14
1
6
0
1
2
4
6
2
0
1
1
1

Air Conditioning 2/2
(Electric Machinery Factories)
Localized cooling
Localized ventilation (around hot equipment)
Stratification air-conditioning
Total heat exchanger (recover latent heat)
Sun-light shield (film)
Install gas-fired refrigerator (stop electric refrigerator)
Renewal of low efficiency refrigerator
Change of humidity control method (from boiler to spray)
Change of humidification process (from refrigeration to adsorption)
Reduction of air-conditioning load (insulation)
Modification of ventilation system
High-efficiency air gun
2
3
1
1
2
1
2
1
1
2
1
1

sub total 57

35/85
Next
AEEC Home | Training Index | Index | Top | Previous | Next
Copyright(C) ECCJ 1996-2019