AEEC Home | Training Index | Index | Top | Previous | Next

METI / ECCJ / ACE Training Program MTPEC04 (2006.02)

ENERGY AUDITS IN INDUSTRIAL PLANTS
Energy Audit's Steps
  1. Detailed Audit
    During detailed audit for example:
    - In a Ceramic Factory
    • If there are no waste heat recovery systems Waste Exhaust Gas temperatures and flow rates, discharged from firing kilns,
    • Firing kilns pressures, surface temperatures,
    • Product input and output temperatures to/from firing kilns,
    • Humidity content of raw materials,
    • Some specifications of product carrying cars, etc.

ENERGY AUDITS IN INDUSTRIAL PLANTS
Energy Audit's Steps
  1. Detailed Audit
    During detailed audit for example:
    - In a Arc Furnace Iron and Steel Factory
    • Exhaust Gas temperatures, flow rates, chemical composition, discharged from arc furnace,
    • Cooling water temperatures and flow rates,
Should be measured, some other necessary information and factory exisiting panel meters recorded data should be taken.

46/85
Next
AEEC Home | Training Index | Index | Top | Previous | Next
Copyright(C) ECCJ 1996-2019