AEEC Home | Training Index | Index | Top | Previous | Next |
METI / ECCJ / ACE Training Program MTPEC06 (2007.01) |
2.2 Method of obtaining a grasp of the quantity of energy used under integrated heat and electricity management |
![]() |
Example: If a business place that has received a designation for type 1 electricity alone changes over the heat source equipment for a cooling system from an electric turbo chiller to an absorption type chiller in order to reduce consumption of electricity, and receives a type 2 electricity and type 2 heat designation, it will no longer have the duty of energy conservation measures for the type 1 factory. |
2.3 The combination pattern of Designated Energy Management Factory (as of 31 March 2002) |
![]() |
(A)
2.4 Obligations of 1st Class Designated Energy Management Factories |
|
(B)
2.5 Obligations of 2nd Class Designated Energy Management Factories |
|
3/19 Next |
AEEC Home | Training Index | Index | Top | Previous | Next |