AEEC Home | Training Index | Index | Top | Previous | Next

METI / ECCJ / ACE Training Program MTPEC08 (2008.01)

(2) Energy Audit Procedures
  • 1. Prerequisites of Audit Procedures
  • (Top policy, proper organization, etc.)
  • 2. Data Collection (Technical Documents,
  • Measurements for thermal equipment)
  • 3. Data Analysis, EC improvement measures
  • 4. Evaluation of Alternatives
  • 5. Development of Action Plan
  • (Further steps not included in Energy Audit: Budgeting,
  • Implementation, Evaluation of results and follow-up)

Type of Audit:

Methodology of Energy Audit
  • 1. Interviews, Questionnaires
  • 2. Review of documents
  • (Records of production, energy consumption)
  • (Technical Documents)
  • 3. Site or Field Inspection
  • (including Measurement,when necessary)
  • 4. Others

(3) Top Policy and proper Organization
  • (Prerequisites of Energy Audit)
  • 1. Top management shall announce Clear Top
  • Policy of Energy Conservation (with Goals)
  • 2. Proper EC Organization shall be established
  • to promote EC activities
  • ( Energy Manager, Committee or the like,
  • depending on the features of the factory)

(4) Data Collection (including Measurements)
  • "Where are we now ?"
  • Energy Intensity(or specific energy consumption)
  • defined as : Energy consumed per unit production*
  • (*or sometimes throughput)
  • Historical data (for at least 2 years) should be reviewed
  • to see - Any trends
  • - Seasonal changes
  • - Changes in situations
  • (Internal and external)
  • - Other factors

Technical Documents
  • 1. Design Books
  • 2. Records of Commissioning
  • (Performance Test Records)
  • 3. Other related documents
  • (Operation manuals, Maintenance manuals,
  • and so on)

Measurement of data for thermal equipment
  • 1. Process data
  • (Flow, temperature, etc.)
  • 2. Utility data
  • (Flow, temperature, etc.)
  • 3. Data for calculating
  • - Material balance
  • - Heat balance
  • - Thermal efficiency
  • *Data sheet or format is very useful for recording data
  • ( In-house Database to be developed)

2/13
Next
AEEC Home | Training Index | Index | Top | Previous | Next
Copyright(C) ECCJ 1996-2008