Example-2 : Optimum Management of utility facilities
Summary of the EC project
    1.Summary
    A new advanced control system for utility facilities (boilers, STG, GTG) was developed, which prioritize operation of higher efficiency facilities, thus generating required steam and power with the minimum fuel consumption all the time.
    2.Period from planning up to confirmation of results October 2002 to March 2005 (30 months in total)
    3.Results
    Fuel saving
    : 6,600 KL-FOE/Y
    (160million Japanese yen/Y)

Outline of utility facilities