AEEC Home | Training Index | Index | Top | Previous | Next |
ECCJ / TextReport | India |
EE&C Measures
6. Rotating machines and other equipment |
- Control No. of operating machines (if too big capacity) - Control rotating speed of turbines
- Install variable speed device for motor
|
EE&C Measures
7. Process, instrumentation and management system |
- Streamline manufacturing process
- Integrate various process units, or rationalize manufacturing process - Introduce computer system for management purpose (ex. Optimum management of utility facilities - See Case Studies)
|
EE&C Measures
8. Material loss prevention and others
|
- Minimize loss at loading/unloading operation
- Employ hydrogen cascading in a series of HDS units - Recover hydrogen from bleed gas in HDS unit - Rationalize refinery off gas and hydrogen gas systems |
IV. Case Studies
|
2. Drastic Modification of ARHDS unit 3. Minimizing spill-back flow of big compressor 4. Utilization of catalytic reformer hydrogen 5. Heat integration among different process units 6. Prevention of inner coking of fired heater tubes Remarks: Item No.1 is shown here with some details |
9/13 Next |
AEEC Home | Training Index | Index | Top | Previous | Next |