AEEC Home | Training Index | Index | Top | Previous | Next |
ECCJ / TextReport | India |
![]() |
(2) Measurement and record on the waste heat
|
1) The temperature, flow rate, etc. are monitored and measured by the DCS. |
(3) Inspection and maintenance of the waste heat recovery system
|
1) Inspection and maintenance of the gas air preheater (GAH) A steam soot blower is activated about every 8 hours to clean the element surface. A low-temperature element tends to quickly get corroded, its trend is monitored to replace it ahead of time. An air leak rate is measured to replace a sealing plate, etc., if it worsens. |
3/7 Next |
AEEC Home | Training Index | Index | Top | Previous | Next |
Copyright(C) ECCJ 1996-2019 |