| General administrative matter 
          Heat source, heat transfer facilityEnergy management system
            Organization improvement, human resource developmentEnergy conservation target, investment budgetSetting of management standardsState of implementation of energy conservation State of implementation of measurement / recording
            State of installation and operation of measuring instrumentsState of maintenance, inspection of measuring instrumentsState of implementation of periodic measurements and recordingState of introduction of measurement and control systems Management of energy consumption
            State of keeping daily reportsDaily consumption, daily load variation curvesMonthly consumptionGraph for the ratio to the consumption of the receding year State of facility and equipment maintenance
                Periodic inspection, routine inspectionManagement of facility performance , coefficient of performance (COP)Management of system performance (COP)Facility and equipment cleaning (filter, strainer) Energy unit consumption management
            Heating value unit consumption (MJ/m2 year)Energy cost unit consumption (1,000 yen/m2 year)Unit consumption by use of buildingUnit consumption by consuming end  Plan-do-check-action (PDCA) management circle
            State of implementation of PDCA managementState of implementation of continual improvement 
          Management of combustion facility performance
            Air ratio, exhaust gas managementBurner, fuel, air supply systemCombustion control systemFuel conversion (boiler, generator, etc.) Management of refrigerator performance
            Coefficient of performance (COP)Setting of cooled water outlet temperatureSetting of cooling water temperatureRemoval of scale from heat exchangersTemperature efficiency ratio of heat exchangers Operation management, efficiency management
            Load factor, state of startup and shutdownStart and stop controlThermal efficiency, heat balance, heat distributionSteam pressureWater quality control, blowing operation control Operation management of auxiliary facilities
          
                Operation control of cooling towersWater quality control (electrical conductivity)Operation control of pumps (capacity, head)Improvement of routesOperation management of heat carrier facilities
            Start and stop control of pumps, fansRotation control of pumps, fansImprovement of routes (open, closed)Flow rate, pressureState of opening and closing of valves (automatic valve, header bypass valve, etc.)  Exhaust gas temperature, recovery of waste heat
            Exhaust gas temperature controlHeat recovery (HP, CGS, etc.) Management of steam leaks / insulation
            Piping systemFacility with steam load Management of heat storage; heat storage efficiency
            Heat storage, heat liberation timeImprovement of heat carry routes |