AEEC Home | Training Index | Index | Top | Previous | Next

Training Text MALAYSIA

Establishment of New Project (2/2)



Technology Transfer

Transferred technology should be modified suitable for the developing country !”


<Technology>
  • Verified Technologies
  • New Technologies (examples)
    Regenerative Burner (industry)
    Monitoring Sstem (residential)
    Direct Injection (transportation)
    Measuring & Control System (general), etc.


follow-up consulting



  • Follow-up consulting after technical cooperation
  • General consulting on energy conservation & efficiency
  • Information (Energy statistics, Best practices for energy conservation, others)

8/8
AEEC Home | Training Index | Index | Top | Previous | Next

Copyright(C) ECCJ 1996-2019