Energy conservation check item (factory,
building)
|
Energy conservation measure for factories
(Energy Conservation Guidebook for Factories
2003-3)
2 Check item for energy conservation measure for factories -1 3 Check item for energy conservation measure for factories -2 4 Check item for energy conservation measure for factories -3 5 Check item for energy conservation measure for factories -4 Energy conservation measure for buildings (Energy Conservation Guidebook for Buildings 2004-3) 6 Check item for energy conservation measure for buildings -1 7 Check item for energy conservation measure for buildings -2 8 Check item for energy conservation measure for buildings -3 |
Check item for energy conservation measure
for factories -1
|
General administrative matter 1. Energy management system - Organization improvement, human resource development - Compatibility with environmental management - Energy conservation target, investment budget - Long- and medium-range plans - Adoption of official preferential treatment systems - State of implementation of energy conservation 2. State of implementation of measurement / recording; state of installation and employment of measuring instruments - State of maintenance, inspection of measuring instruments - State of implementation of periodic measurements and recording 3. State of facility and equipment maintenance - Periodic inspection, routine inspection - Repairing of leaks (water, air, steam) - Heat insulation, insulation - Facility and equipment cleaning (filter, strainer), etc. 4. Management of energy consumption - State of keeping daily reports - Daily consumption, daily load variation curves - Monthly consumption, ratio to the consumption of the preceding year graphs 5. Energy unit consumption management for major products - Energy unit consumption versus delivery price - Energy unit consumption versus production amount 6. Environmental conservation related management - State of implementation of measured for reducing CO2 emission - State of utilizing the Law for Promoting Energy Conservation and Recycling - State of LCA (Life Cycle Assessment) - Waste treatment: state of promotion of waste reduction, sorting and recycling - Wastewater treatment 7. Improvement of processes - Improvement of processes - Reviewal of the factory line - Realization of continuous operation, efficiency improvement |
Check item for energy conservation measure for factories -2 |
Air conditioning, refrigeration facility
1. Operation management - Optimization of set temperature and humidity - Reduction of outdoor air for ventilation - Start and stop control of heat generating machines - Adjustment of cooled water outlet set temperature - Scheduled operation - Prevention of outdoor air intrusion, state of ventilation - Shielding of radiation heat from high-temperature machines 2. Energy conservation measure, improvement of building insulation, shielding of solar insolation - Utilization of outdoor air - Recovery and utilization of waste heat, heat pump - Rotation control (VAV, etc.) of transportation machines (pumps, fans) - Adoption of local cleaning, local exhaust - Stratified air conditioning, reduction of air volume to be conditioned - Utilization of the ice thermal storage system 3. Operation management of cooling facilities, operation power of refrigerator - Inlet and outlet pressures of the refrigerant - Inlet and outlet temperature and pressure of water 4. Operation management of auxiliary facilities, operation power of the cooling tower - Water quality control (electric conductivity) - Operating power of pumps (capacity, head) 5. Cold insulation, refrigerating facility, management on entering and exiting - Insulation management - Efficiency improvement Pump, fan; compressor 1. Operation management of pumps, fans - Opening and closing of valves - Improvement of routes (pining, ducts) - Operation flow rate, operation pressure - Degree of design allowance - Rotation control, start and stop control 2. Operation management of the compressor systems - Reviewal of the type (screw, reciprocating, blower) -Compatibility between capacity and type - Reduction of discharge pressure and user-end pressure - Separation between high pressure and low pressure lines - Ventilation facility, ambient temperature - Reviewal of pipe size, piping route - Installation of air receiver - Start and stop control - Optimum capacity control - Leak prevention measure - Utilization of waste heat |
Check item for energy conservation measure for factories -3 |
Boiler, industrial furnace, steam system,
heat exchanger, waste heat, wastewater, etc. 1. Combustion management of furnace; air ratio, exhaust gas control - Burner, fuel, air supply system - Combustion control system - Regenerative combustion system - Fuel conversion 2. Furnace operation, efficiency control; load factor, state of startup and shutdown - Start and stop control - Thermal efficiency, heat balance, heat distribution - Water quality control, blowing operation control 3. Furnace insulation; thermal insulation and radiation loss prevention; outer wall surface temperature, duct temperature - Insulation, insulating material (heat storage loss) - Sealing of openings, furnace inside pressure 4. Furnace flue gas temperature control, waste heat recovery; exhaust gas temperature - Heat recovery (water supply, air preheating) - Flue gas recirculation 5. Operation management of steam; dryness, carryover - Set pressure, temperature of steam for facilities - Steam flow rate 6. Management of steam leaks / insulation; piping system, tank, etc. - Facility with steam load 7. Optimization of steam piping system - Route, pipe size - Removal of unnecessary piping - Integration of multiple steam systems 8. Load leveling of steam system - Installation of accumulator - Replacement of ejectors with vacuum pumps - Load side measure 9. Recovery and use of steam drain - Recovery of medium / low pressure steam (back pressure turbine) - Steam trap management - Place of recovered drain collection, drain recovery and collection system - Utilization of flash steam 10. Operation management of heat exchangers - Adequacy of type - Adequacy of use and heating medium - State of maintenance (fouling, pressure loss) - Temperature of heating medium, and heated material - Temperature efficiency ratio 11. Reduction of waste heat / wastewater - Heat recovery from hot water - Rationalization of exhaust gas duct - Recirculation of cooling water - Concentration control of impurities in water |
Check item for energy conservation measure for factories -4 |
Substation facility, motor, lighting equipment,
electrical heating facility 1. Substation facility management; demand, load factor, power factor control - Consumption control - Tariff control (contract power) - Utilization of nighttime power 2. Transformer facility management; transformer capacity, voltage - Demand factor / load adjustment - Shutting off of unnecessary loads 3. Motor capacity / operation management; facility capacity, voltage, number - Rotation control - Termination of idle operation 4. Operation management of lighting equipment; adoption of high-efficiency lamps and equipment - Adoption of automatic switches, zone controlled lighting - Location of lighting equipment installation, circuit partitioning - Proper illuminance control - Turning off of lights during idle hours, sunlight utilization - Cleaning of lighting equipment, replacement of lighting equipment 5.Operation management of electrical heating facility - Improvement of supply voltage, power factor - Control of material feeding and product withdrawal, material preheating - Temperature control, heating control - Insulation control - Improvement of load factor - Continuous operation - Reuse of exhaust heat 6.Load leveling measure - Reviewal of operation pattern (operation hour, operation rate, load factor, etc.) - Measures for facilities (heat storage facility, absorption-type water heater / cooler, etc.) 7.Co-generation introduction, etc. introduction plan - Type of facility, capacity, fuel - Seasonal load fluctuation - Operation rate, heat electricity ratio - Inspection, standby electric power supply, pollution prevention measure 8.New energy, etc. - Fuel cell - Photovoltaic power generation - Solar heat |
Check item for energy conservation measure for buildings -1 | |
General administrative matter 1. Energy management system - Organization improvement, human resource development - Energy conservation target, investment budget - Setting of management standards - State of implementation of energy conservation 2. State of implementation of measurement / recording - State of installation and operation of measuring instruments - State of maintenance, inspection of measuring instruments - State of implementation of periodic measurements and recording - State of introduction of measurement and control systems 3. Management of energy consumption - State of keeping daily reports - Daily consumption, daily load variation curves - Monthly consumption - Graph for the ratio to the consumption of the receding year 4. State of facility and equipment maintenance - Periodic inspection, routine inspection - Management of facility performance , coefficient of performance (COP) - Management of system performance (COP) - Facility and equipment cleaning (filter, strainer) 5. Energy unit consumption management - Heating value unit consumption (MJ/m2 year) - Energy cost unit consumption (1,000 yen/m2 year) - Unit consumption by use of building - Unit consumption by consuming end 6. Plan-do-check-action (PDCA) management circle - State of implementation of PDCA management - State of implementation of continual improvement Heat source, heat transfer facility 1. Management of combustion facility performance - Air ratio, exhaust gas management - Burner, fuel, air supply system - Combustion control system - Fuel conversion (boiler, generator, etc.) 2. Management of refrigerator performance - Coefficient of performance (COP) - Setting of cooled water outlet temperature - Setting of cooling water temperature - Removal of scale from heat exchangers - Temperature efficiency ratio of heat exchangers 3. Operation management, efficiency management - Load factor, state of startup and shutdown - Start and stop control - Thermal efficiency, heat balance, heat distribution - Steam pressure - Water quality control, blowing operation control 4. Operation management of auxiliary facilities - Operation control of cooling towers - Water quality control (electrical conductivity) - Operation control of pumps (capacity, head) - Improvement of routes 5. Operation management of heat carrier facilities - Start and stop control of pumps, fans - Rotation control of pumps, fans - Improvement of routes (open, closed) - Flow rate, pressure - State of opening and closing of valves (automatic valve, header bypass valve, etc.) 6. Exhaust gas temperature, recovery of waste heat - Exhaust gas temperature control - Heat recovery (HP, CGS, etc.) 7. Management of steam leaks / insulation - Piping system - Facility with steam load 8. Management of heat storage; heat storage efficiency - Heat storage, heat liberation time - Improvement of heat carry routes |
Check item for energy conservation measure for buildings -2 |
Air conditioning, ventilation facility 1. Operation management of air conditioners - Optimization of set temperature and humidity - Appropriateness of humidification zones, and types - Appropriateness of reheating - Unevenness of humidity distribution - Warming up operation - Outdoor air intake control - Reviewal of operation time - Suspension of air conditioning to unused rooms - Shutting off of outdoor air intrusion - Control of indoor environment (CO2 , etc.) 2. Management of air conditioning efficiency - Zone controlled air conditioning - Utilization of outdoor air (cooling with outside air) - Setting of dew point control - Prevention of mixing loss - Night purge - Water spraying of roof, outdoor units of air conditioners - Accuracy of automatic control 3. Introduction of energy conservation equipment - Heat carrier speed control (VAV,VWV) - Outdoor air intake control system (control on CO2 concentration) - Cooling with outside air (outside air enthalpy control) - Installation of total heat exchanger - Zone controlled cooling, zone controlled ventilation - Roof greening, etc. 4. Management of ventilation facilities - Optimization of number of ventilation times - Reviewal of operation time - Operation temperature control (electric room, machine room, CVCF room) - Suspension of ventilation to unused rooms - Zone controlled ventilation - Parking space ventilation control (control on CO2 concentration) - Ventilator speed control (VAV,VWV) Facilities for hot water supply, water supply and drainage, refrigeration, cold storage, cooking 1. Management of hot water supply facility - Hot water supply temperature - Hot water supply efficiency improvement (removal of scales) - Operation in winder only - Operation schedule control for holidays and nighttime - Waste heat utilization (CGS, steam drain) - Solar heat utilization 2. Management of water supply and drainage facilities - Utilization of reclaimed water (rain water, well water, etc.) - Water saving measure (water saving packing, automatic washing machine, sound effect equipment, water saving shower) - Water supply flow rate, pressure - Utilization of effluent water 3. Management of refrigeration, cold storage, cooking facilities - Insulation control - Opening and closing control of doors - Control of showcases - Efficiency improvement - Insulation and defrosting control - Management of cooking facilities (cooker, dish dryer, washing machine, etc.) |
Check item for energy conservation measure for buildings -3 |
Substation facility, lighting equipment,
electric equipment 1. Substation facility management - Voltage control - Power factor control - Transformer capacity - Demand factor / load adjustment - Shutting off of unnecessary transformer - Optimization of demand - Electric power consumption control - Utilization of nighttime electric power - Power factor improvement control - Demand control - Transformer loss - Start and stop control of transformers 2. Operation management of lighting equipment - Proper illuminance control - Turning off of lights during idle hours (sunlight utilization) - Cleaning of lighting equipment, replacement of lighting equipment - Location of lighting equipment, circuit partitioning - Light dimming and extinguishing by automatic lighting control - Zone controlled lighting - Adoption of energy saving bulbs - Improvement of coefficient of utilization (reflectivity) - Outdoor lighting control - Turning off at night of luminaires for emergency exist sign - Adoption of high efficiency lamps - Adoption of high efficiency equipment - Adoption of inverter ballasts - Task ambient system - Switching control - Daylight lighting system 3. Management of OA equipment - Reduction of stand-by electric power - Turning off the main switches during idle hours - Adoption of energy-saving models 4. Management of automatic vending machines - Adoption of energy-saving models - Service hour control Elevator, building 1. Operation management of elevators - Start and stop control of elevators - Time zone operation schedule control - Reduction of mechanical power loss in the power transmission system - Reduction of floors for the elevators to stop - Adoption of inverter control 2. Operation management of escalators - Time zone operation schedule control - Application of occupancy sensor to the operation 3. Energy conservation of buildings - Thermal insulating performance of structures - Heat insulation and airtightness of windows - Shutting off of outdoor air intrusion (air lock entry space, revolving door, etc.) - Shielding of solar insolation of windows (curtain, light control film) - Shielding of solar insolation of roofs (heat reflecting paint) - Air flow window - Roof greening - Green office building plan Leveling of load 1. Load leveling measure - Reviewal of operation pattern (operation hour, operation rate, occupancy rate, load factor, etc.) - Measures for facilities (ice thermal storage system, absorption type water heater / cooler, etc.) 2. Co-generation - Operation management (power generation efficiency, utilization rate of waste heat, overall efficiency, etc.) - Type of facility, capacity, fuel - Seasonal load fluctuation - Operation rate, heat electricity ratio 3. New energy - Fuel cell - Photovoltaic power generation - Solar heat - Wind power generation |