1. Operation management
  • Optimization of set temperature and humidity
  • Reduction of outdoor air for ventilation
  • Start and stop control of heat generating machines
  • Adjustment of cooled water outlet set temperature
  • Scheduled operation 'Prevention of outdoor air intrusion, state of ventilation
  • Shielding of radiation heat from high-temperature machines
2. Energy conservation measure, improvement of building insulation, shielding of solar insolation
  • Utilization of outdoor air
  • Recovery and utilization of waste heat, heat pump
  • Rotation control (VAV, etc.) of transportation machines (pumps, fans)
  • Adoption of local cleaning, local exhaust
  • Stratified air conditioning, reduction of air volume to be conditioned
  • Utilization of the ice thermal storage system
3. Operation management of cooling facilities, operation power of refrigerator
  • Inlet and outlet pressures of the refrigerant
  • Inlet and outlet temperature and pressure of water
4. Operation management of auxiliary facilities, operation power of the cooling tower
  • Water quality control (electric conductivity)
  • Operating power of pumps (capacity, head)
5. Cold insulation, refrigerating facility, management on entering and exiting
  • Insulation management
  • Efficiency improvement
Pump, fan; compressor
1. Operation management of pumps, fans
  • Opening and closing of valves
  • Improvement of routes (pining, ducts)
  • Operation flow rate, operation pressure
  • Degree of design allowance
  • Rotation control, start and stop control
2. Operation management of the compressor systems
  • Reviewal of the type (screw, reciprocating, blower)
  • Compatibility between capacity and type
  • Reduction of discharge pressure and user-end pressure
  • Separation between high pressure and low pressure lines
  • Ventilation facility, ambient temperature
  • Reviewal of pipe size, piping route
  • Installation of air receiver
  • Start and stop control
  • Optimum capacity control
  • Leak prevention measure
  • Utilization of waste heat

Check item for energy conservation
measure for factories -3
Boiler, industrial furnace, steam system, heat exchanger, waste heat, wastewater, etc.

1. Combustion management of furnace; air ratio, exhaust gas control
  • Burner, fuel, air supply system
  • Combustion control system
  • Regenerative combustion system
  • Fuel conversion
2. Furnace operation, efficiency control; load factor, state of startup and shutdown
  • Start and stop control
  • Thermal efficiency, heat balance, heat distribution
  • Water quality control, blowing operation control
3. Furnace insulation; thermal insulation and radiation loss prevention; outer wall surface temperature, duct temperature
  • Insulation, insulating material (heat storage loss)
  • Sealing of openings, furnace inside pressure
4. Furnace flue gas temperature control, waste heat recovery; exhaust gas temperature
  • Heat recovery (water supply, air preheating)
  • Flue gas recirculation
5. Operation management of steam; dryness, carryover
  • Set pressure, temperature of steam for facilities
  • Steam flow rate
6. Management of steam leaks / insulation; piping system, tank, etc.
  • Facility with steam load
7. Optimization of steam piping system
  • Route, pipe size
  • Removal of unnecessary piping
  • Integration of multiple steam systems
8. Load leveling of steam system
  • Installation of accumulator
  • Replacement of ejectors with vacuum pumps
  • Load side measure
9. Recovery and use of steam drain
  • Recovery of medium / low pressure steam (back pressure turbine)
  • Steam trap management
  • Place of recovered drain collection, drain recovery and collection system
  • Utilization of flash steam
10. Operation management of heat exchangers
  • Adequacy of type
  • Adequacy of use and heating medium
  • State of maintenance (fouling, pressure loss)
  • Temperature of heating medium, and heated material
  • Temperature efficiency ratio
11. Reduction of waste heat / wastewater
  • Heat recovery from hot water
  • Rationalization of exhaust gas duct
  • Recirculation of cooling water
  • Concentration control of impurities in water