Check item for energy conservation
measure for buildings -2
Air conditioning, ventilation facility

1. Operation management of air conditioners
  • Optimization of set temperature and humidity
  • Appropriateness of humidification zones, and types
  • Appropriateness of reheating
  • Unevenness of humidity distribution
  • Warming up operation
  • Outdoor air intake control
  • Reviewal of operation time
  • Suspension of air conditioning to unused rooms
  • Shutting off of outdoor air intrusion
  • Control of indoor environment (CO2 , etc.)
2. Management of air conditioning efficiency
  • Zone controlled air conditioning
  • Utilization of outdoor air (cooling with outside air)
  • Setting of dew point control
  • Prevention of mixing loss
  • Night purge
  • Water spraying of roof, outdoor units of air conditioners
  • Accuracy of automatic control
3. Introduction of energy conservation equipment
  • Heat carrier speed control (VAV,VWV)
  • Outdoor air intake control system (control on CO2 concentration)
  • Cooling with outside air (outside air enthalpy control)
  • Installation of total heat exchanger
  • Zone controlled cooling, zone controlled ventilation
  • Roof greening, etc.
4. Management of ventilation facilities
  • Optimization of number of ventilation times
  • Reviewal of operation time
  • Operation temperature control (electric room, machine room, CVCF room)
  • Suspension of ventilation to unused rooms
  • Zone controlled ventilation
  • Parking space ventilation control (control on CO2 concentration)
  • Ventilator speed control (VAV,VWV)
Facilities for hot water supply, water supply and drainage, refrigeration, cold storage, cooking

1. Management of hot water supply facility
  • Hot water supply temperature
  • Hot water supply efficiency improvement (removal of scales)
  • Operation in winder only
  • Operation schedule control for holidays and nighttime
  • Waste heat utilization (CGS, steam drain)
  • Solar heat utilization
2. Management of water supply and drainage facilities
  • Utilization of reclaimed water (rain water, well water, etc.)
  • Water saving measure (water saving packing, automatic washing machine,
    sound effect equipment, water saving shower)
  • Water supply flow rate, pressure
  • Utilization of effluent water
3. Management of refrigeration, cold storage, cooking facilities
  • Insulation control
  • Opening and closing control of doors
  • Control of showcases
  • Efficiency improvement
  • Insulation and defrosting control
  • Management of cooking facilities (cooker, dish dryer, washing machine, etc.)

Check item for energy conservation
measure for buildings -3

Substation facility, lighting equipment, electric equipment

1. Substation facility management
  • Voltage control
  • Power factor control
  • Transformer capacity
  • Demand factor / load adjustment
  • Shutting off of unnecessary transformer
  • Optimization of demand
  • Electric power consumption control
  • Utilization of nighttime electric power
  • Power factor improvement control
  • Demand control
  • Transformer loss
  • Start and stop control of transformers
2. Operation management of lighting equipment
  • Proper illuminance control
  • Turning off of lights during idle hours (sunlight utilization)
  • Cleaning of lighting equipment, replacement of lighting equipment
  • Location of lighting equipment, circuit partitioning
  • Light dimming and extinguishing by automatic lighting control
  • Zone controlled lighting
  • Adoption of energy saving bulbs
  • Improvement of coefficient of utilization (reflectivity)
  • Outdoor lighting control
  • Turning off at night of luminaires for emergency exist sign
  • Adoption of high efficiency lamps
  • Adoption of high efficiency equipment
  • Adoption of inverter ballasts
  • Task ambient system
  • Switching control
  • Daylight lighting system
3. Management of OA equipment
  • Reduction of stand-by electric power
  • Turning off the main switches during idle hours
  • Adoption of energy-saving models
4. Management of automatic vending machines
  • Adoption of energy-saving models
  • Service hour control
Elevator, building

1. Operation management of elevators
  • Start and stop control of elevators
  • Time zone operation schedule control
  • Reduction of mechanical power loss in the power transmission system
  • Reduction of floors for the elevators to stop
  • Adoption of inverter control
2. Operation management of escalators
  • Time zone operation schedule control
  • Application of occupancy sensor to the operation
3. Energy conservation of buildings
  • Thermal insulating performance of structures
  • Heat insulation and airtightness of windows
  • Shutting off of outdoor air intrusion (air lock entry space, revolving door, etc.)
  • Shielding of solar insolation of windows (curtain, light control film)
  • Shielding of solar insolation of roofs (heat reflecting paint)
  • Air flow window
  • Roof greening
  • Green office building plan
Leveling of load
1. Load leveling measure
  • Reviewal of operation pattern (operation hour, operation rate, occupancy rate, load factor, etc.)
  • Measures for facilities (ice thermal storage system, absorption type water heater / cooler, etc.)
2. Co-generation
  • 'Operation management (power generation efficiency, utilization rate of waste heat, overall efficiency, etc.)
  • Type of facility, capacity, fuel
  • Seasonal load fluctuation
  • Operation rate, heat electricity ratio
3. New energy
  • Fuel cell
  • Photovoltaic power generation
  • Solar heat
  • Wind power generation