Improvement case (No. 1)

Improvement case (No. 1)

Improvement case (No. 1)
    4. Contents of improvement (5)
         In order to maintain the optimum operating conditions obtained through the measures mentioned in item 2) above, we standardized the management of the measures taken.

    1. Setting of lower limit of the air-feeding pressure (Standardized in the energy conservation management standard.)
    2. Standardization of the shape of furnaces based on the tapping rate
    3. Use of the optimum mixing ratio of the coke (The mixing instruction was prepared by the technical department for standardization for use at the worksite.)

Improvement case (No. 1)

5/6
Next