AEEC Home | Training Index | Index | Top | Previous | Next

ECCJ / AOTS Philippines training course Philippines

Contract Schemes and Financial Flow (2/2)
"Shared Saving Contract" --- ESCO-financed

Breakdown of Combined Order Value by Type of Service
Source :
Jun. 2004, Survey of Japan Association of Energy Service Companies (membership 107 companies)

Breakdown of Combined Order Value by Type of Contract (ESCO Projects)
Source :
Jun. 2004, Survey of Japan Association of Energy Service Companies (membership 107 companies)

ESCO Project Example (city hotel)
1. Name of example ANA Hotel Tokyo Energy Conservation Retrofitting
2. ESCO Yamatake Building System Co., Ltd.
3. Facility overview
Contract demand 3,600 kW Receiving voltage 22 kV
Number of stories Three stories below ground and 37 stories above ground Air-conditioning facility District heating and cooling (chilled water and steam)
Total floor area 98,000 m2 Air-conditioning scheme Central air conditioning, fan coil unit and packaged air conditioner
4. Energy conservation techniques
Air conditioner inverter control Inverter control of air conditioner fan according to room thermal load
CO concentration control of parking area ventilation Inverter control of parking area exhaust fans according to CO2 concentration
Fresh air intake control based on CO2 concentration Control of fresh air intake according to indoor CO2 concentration
Introduction of heat-insulating film Covering of exterior windows of guests' rooms with heat-insulating film to reduce thermal load component attributable to outside air
Introduction of BEMS Energy conservation through optimization of operating hours of facilities and equipment and thermal/humidity environment according to load conditions
(ESCO 2004-8)

ESCO Project Example (city hotel) cont'd

5. Finance Self-financing
6. Utilization of assistance measures
High-Efficiency Housing/Building Energy System Introduction Promotion Program
7. Type of contract and contract duration
Guaranteed-savings, three years
8. Owner benefits - sales points
Although the hotel is open for business twenty-four hours a day all year round, the air-conditioning load fluctuates from season to season and hour to hour. In this regard, the project will make it possible to optimize the operation of the air-conditioning system by automatically changing its output according to load conditions, thus eliminating energy wastage, and this is its greatest benefit.
9. Client's comments
The introduction of the energy conservation system has been delivering the expected energy savings. In fact, BEMS-based energy data analysis has brought about an even higher energy efficiency by inducing more energy-conscious building operation.
10. Problems encountered at time of introduction and solution measures
As the project was implemented while maintaining normal business activities, close consultations were held in advance regarding the equipment delivery schedule, working hours, etc.


10/11
Next
AEEC Home | Training Index | Index | Top | Previous | Next