1-3.Check item of factory audit – 1
    → Following items are mentioned in the audit report.
    1. General administrative matter
      - Energy management system
      - State of implementation of measurement / recording
      - State of facility and equipment maintenance
      - Management of energy consumption
      - Energy unit consumption management for major products
      - Environmental conservation related management
      - Improvement of processes
    2. Air conditioning / refrigerating facility
      - Operation management
      - Energy conservation measure
      - Operation management of cooling facilities
      - Operation management of auxiliary facilities
      - Insulation / refrigerating facilities

1-3.Check item of factory audit – 2
    3. Pump / fan, compressor
      - Operation management of pumps / fans
      - Operation management of the pneumatic system
    4. Boiler / industrial furnace, steam system, heat exchanger, waste heat / wastewater, etc.
      - Combustion management
      - Operation / efficiency management
      - Insulation / heat insulation and prevention of heat radiation loss
      - Temperature control of exhaust gas
      - Operation management of steam
      - Management of steam leaks / insulation
      - Optimization of piping system
      - Leveling of load
      - Recovery and reuse of steam drain
      - Operation management of heat exchanger
      - Reduction of waste heat / wastewater

1-3.Check item of factory audit – 3
    5. Substation facility, motor, lighting equipment, electrical heating facility
      - Substation facility management
      - Transformer facility management
      - Motor capacity / operation management
      - Operation management of lighting equipment
      - Operation management of electrical heating facility
    6. Improvement of processes
      - Improvement of the operation
      - Review of the factory processing line
      - Realization of efficiency improvement, continuous operation
      - Others

1-3.Check item of factory audit – 4
    7. Leveling of load, electric power contract, co-generation, new energy, etc.
      - Load leveling measure
      - Contract for control of demand and supply, etc.
      - Plan for introduction of co-generation, etc.
      - New energy, etc.
      - Energy conversion