ENERGY AUDITS IN INDUSTRIAL PLANTS
Energy Audit's Steps
  1. Pre - Audit
    During pre - audit waste of energy sources, insufficient and inappropriate insulation, steam, water leakages, are tried to be determined by inspecting departments of the factory, and some necessary measurement such as boiler combustion air etc. are made

ENERGY AUDITS IN INDUSTRIAL PLANTS
Energy Audit's Steps
  1. Pre - Audit
    As a result of pre - audit, energy conservation opportunities can be determined in auxiliary systems, energy management system, electrical systems, etc.
    Also according to the existing condition and result, if a detailed audit is needed or not can be determined.